Chamberlains Barn, Leighton Buzzard
Stages 1, 2, 3 and 4 Road Safety Audits
Chamberlain’s Barn is part of a large urban extension scheme on the northeast side of Leighton Buzzard. It incorporates a network of new spine roads and their connections to the existing highway network, together with a diverted and elevated small gauge single track industrial railway.
Gateway RSE has conducted Road Safety Audits at Stages 1, 1/2, 2 and 3.
Notable features of the scheme include an uncontrolled level crossing close to a crossroads junction, a short section of one-way operation and an associated no entry gateway on one of the link roads.
Objectives and Challenges
A number of road safety problems were identified by the audits, but our constructive recommendations enhanced the scheme from a road safety perspective within reasonable budgetary and physical constraints.
Added Value and Benefits
Consequently, the proposed highway works have been approved and will help to deliver approximately 950 much needed new homes.